Laurel Carpenter Research Journal (Summer '21)

07/06-07/09

07/06

  • starting to look at controls for rigol pulser

06/28-07/02

07/02

  • finishing double PSU
    • issue w/ voltage tracking seems to be that the output must be turned off before voltage tracking is toggled, but will have to check on machine

07/01

  • looking into voltage tracking options for double PSU
06/30
  • finished basic controls for double PSU (output on/off, voltage, current) + added a master output option
  • looked into adding controls for voltage tracking and remote lock, ran into some issues
  • created github repository for GUI and for the modules we've written to control specific PSUs
06/29
  • began work on GUI widget for double PSU
06/28

-- Massimo Capasso - 2021-07-01

Comments



This topic: Veritas > WebHome > GroupMeetings > SummerResearchJournals > ResearchJournalForLaurelCarpenter
Topic revision: r3 - 2021-07-06 - LaurelCarpenter
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2022 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback