TWiki> Veritas Web>PSCT>NevisLabsSetup (revision 8)EditAttach

FPM+FEE modules testing at Nevis Laboratories

  • eLogs
  • ToDoList:
    1. UPS setup
      1. Setup remote control with network card (support: Bill)
        1. ✔ Make connection (Bill sets up monitoring)
        2. ✔ Figure out remote controlling
      2. Connect: SiPMs PSU, Adapter PSU, PC, Fan, Function Generator, Laser driver
    2. ✔ Replace bias capacitors on SMART test board. See red circle in enclosed picture: 20201022_171019_MOD2.jpg (support: Nancy):
      1. C1, C3, C4: replace with 100nF, 100V (1206 package)
      2. C5, C6, C7: replace with 2.2uF, 100V (1206 package)
    3. Laser driver:
      1. Setup security switch on dark box
    4. ✔ PSU units:
      1. Write software for remote control. Basic functions: voltage r/w, compliance r/w, current r, enable control, channel select (for dual PSU)
        1. Software details written up in the 2020-12-09 eLog
    5. ✔ PC:
      1. Setup VNC server (support: Deivid)

Networking

Parts List

-- Massimo Capasso - 2020-11-24

Comments


Topic attachments
I Attachment History Action Size Date Who CommentSorted ascending
JPEGjpg 20201022_171019_MOD2.jpg r1 manage 3571.6 K 2020-12-02 - 23:07 MassimoCapasso  
PDFpdf Componente_di_testa_ridotto.pdf r1 manage 162.0 K 2020-11-24 - 20:05 MassimoCapasso  
Microsoft Excel Spreadsheetxlsx NevisLabsEquipment.xlsx r1 manage 11.3 K 2020-11-24 - 16:11 MassimoCapasso  
PDFpdf Setup_test_schede.pdf r1 manage 281.7 K 2020-11-24 - 20:02 MassimoCapasso  
Edit | Attach | Watch | Print version | History: r14 | r10 < r9 < r8 < r7 | Backlinks | Raw View | Raw edit | More topic actions...
Topic revision: r8 - 2020-12-30 - ColinAdams
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2023 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback