November 2020 eLog

2020-11-25
  • Author: Massimo, Colin
  • Mounted side flange to pass cables through (see attached picture) and started to set inside equipment
  • Future side panel: might be nice to look into this aluminum enclosure utlity panel
  • Happy Thanksgiving!
2020-11-23
  • Author: Massimo, Colin
  • Completed dark box mounting (see picture).
    • Encountered problems: top middle rail holes (ø 4.6mm) slightly misaligned (~1-2mm). This blocked the doors closing. Drilled larger hole on right side (5.5mm drill bit) and added spacer from the inside to prevent middle rail from tilting around its axis.
    • Missing side panel: currently at Barnard Center, need to fit equipment in dark box to understand how to cut hole for cables/fiber.
  • Images
2020-11-20
  • Author: Massimo, Colin
  • Crash course to Colin on FEE test stand
  • Dismantle FEE test stand, cut vinyl mat to size and start mounting dark box
2020-11-18
  • Author: Massimo
  • Picked up brass post + matrices holder from Barnard Design Center (see picture)
  • Picked up driver and laser head from Barnard Lab
-- Colin Adams - 2020-12-08

Comments


Topic attachments
I Attachment History Action Size Date Who CommentSorted ascending
JPEGjpg 20201123_175352.jpg r1 manage 3654.3 K 2020-12-09 - 17:30 ColinAdams  
JPEGjpg 20201123_180112.jpg r1 manage 3215.6 K 2020-12-09 - 17:30 ColinAdams  
JPEGjpg 20201123_180148.jpg r1 manage 3604.7 K 2020-12-09 - 17:30 ColinAdams  
Edit | Attach | Watch | Print version | History: r3 < r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions
Topic revision: r3 - 2021-05-13 - ColinAdams
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2023 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback