2020-11-25
- Author: Massimo, Colin
- Mounted side flange to pass cables through (see attached picture) and started to set inside equipment
- Future side panel: might be nice to look into this aluminum enclosure utlity panel
- Happy Thanksgiving!
2020-11-23
- Author: Massimo, Colin
- Completed dark box mounting (see picture).
- Encountered problems: top middle rail holes (ø 4.6mm) slightly misaligned (~1-2mm). This blocked the doors closing. Drilled larger hole on right side (5.5mm drill bit) and added spacer from the inside to prevent middle rail from tilting around its axis.
- Missing side panel: currently at Barnard Center, need to fit equipment in dark box to understand how to cut hole for cables/fiber.
- Images
2020-11-20
- Author: Massimo, Colin
- Crash course to Colin on FEE test stand
- Dismantle FEE test stand, cut vinyl mat to size and start mounting dark box
2020-11-18
- Author: Massimo
- Picked up brass post + matrices holder from Barnard Design Center (see picture)
- Picked up driver and laser head from Barnard Lab
--