Fixed some bugs within the flare detection methods and added the capability of having strictly decreasing flare detection
Continued an investigation into the connections between the exponential profile model used and the specific parameters
A desmos graph was produced which can be shared with anyone on demand
Set up the fermi analysis pipeline within the linux cluster
started the base analysis for Ton 599 to prepare for flare detection and analysis
Monday, July 20th
Wrote up code to take the Bayesian blocks and the baseline Quiescent Flux to determine the time intervals over which there are flares.
This is determined by finding the peak of a given flare and then continuing down the flare up until a certain baseline is reached, at which point the flare is terminated